01-20-2021 01:43 PM
Hello,
what is the method, step by step, to replace a switch in a stack ?
I already had to change the master of a stack once and it was problematic
I had lost the port configuration of the switch master.
So in prevention, I would like to have the exact procedure
first, if it is the stack master that must be replaced
#sh swi
*1 Master 00b6.xxxx.xxxx 13 4 Ready
2 Member 7018.xxxx.xxxx 11 4 Ready
3 Member 2c73.xxxx.xxxx 9 4 Ready
4 Member 2c73.xxxx.xxxx 7 4 Ready
5 Member 2c73.xxxx.xxxx 1 4 Ready
#sh running-config
.....
switch 1 provision ws-c2960x-48lpd-l
switch 2 provision ws-c2960x-48fpd-l
switch 3 provision ws-c2960x-48fpd-l
switch 4 provision ws-c2960x-48fpd-l
switch 5 provision ws-c2960x-48fpd-l
all switches have the same IOS version but my spare switch in case of problem is a c2960x-48fpd-l ( currently the switch master in production is a c2960x-48lpd-l model).
in second, Is the procedure the same if the switch to be replaced is not the master but a member?
and finally, in a 3850 switch stack, is it the same procedure?
thank you
Solved! Go to Solution.
- Labels:
-
LAN Switching
Accepted Solutions
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
03-08-2021 03:49 AM - edited 03-08-2021 10:34 PM
Hello Beaurr
FYI - Just to be clear - If the a switch fails (master or otherwise) the replacement method is just the same- you DONT need to reload the whole stack for a master failed switch to be replaced, it just won’t come back as the master Also you would not need to reload the whole stack just for the failed master to become the master again, unless you rest the master to be exactly the same prior to the master failure.
@Beaurr wrote:
yes, for readability reasons, we want the master to always be the first switch at the top of the stack.
Also it is recommended to designate the master/standby switches to be those that don’t have any uplink interconnects obviously this would be when you have more two switches in a stack, The theory being any failure to a uplink switch(s) wont incur master switch functionality failover at the same time, or if you have a failure of a master you don’t lose uplink connectivity or incur link convergence.
Please rate and mark as an accepted solution if you have found any of the information provided useful.
This then could assist others on these forums to find a valuable answer and broadens the community’s global network.
Kind Regards
Paul
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
01-21-2021 12:41 AM
Most of the switch proceedure is the same - when you replacing the part of the stack member or master switch.
Power down old switch and remove from stack
Offline prepare the switch :
- New switch load same IOS and feature set as exiting stack members
- New switch change switch member number and priority to the old switch member number and priority
- save the config and power down new switch
bringing to Live
- connect the cable new switch to Live stack via stack wise cabling and power new switch up
When master switch fails, other slave switch become master, when the master switch replaced, it will not become master, the slave (be as master) - until whole stack rebooted.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
02-08-2021 10:21 AM
Thank you!
So I need to connect to the new switch ( before stacking this switch)is it given the highest priority?
Like this :
#switch 1 priority 15
( if I want to replace the master)?
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
02-08-2021 12:20 PM
If you are replacing a switch master, you want to connect to the new switch and provision it with the same switch number and priority as the old master but as BB also said, the priority will not change until the stack is rebooted.
HTH
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
02-08-2021 01:55 PM
sure the number should be highest if that should be master ( but required whole stack required to reboot) to become new one to be master.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
03-08-2021 01:12 AM
switch 1 provision ws-c2960x-48lpd-l
switch 2 provision ws-c2960x-48fpd-l
switch 3 provision ws-c2960x-48fpd-l
switch 4 provision ws-c2960x-48fpd-l
switch 5 provision ws-c2960x-48fpd-l
In my network, the switches are numbered from top to bottom. The 1st switch is the master.its priority is 15. Switch 2 has the priority of 11, so switch 2 becomes master The model of my master switch is not quite the same,c2960x-48lpd-l for the master; c2960x-48fpd-l for others. Of course IOS is the same. My spare switches are 2960x-48fpd-l.So I imagine that if I have to change the master I must also connect to the stack before #conf t
#no switch 1 provision ws-c2960x-48lpd-l
# switch 1 provision ws-c2960x-48fpd-l
#wr
on the new switch (before joining it to the stack)
#conf t
#switch 1 priority 15
#wr
Connect the new switch to the stack with stack cable.
Power on the new switch
Reload the entire stack ( ?)
# verify with #sh swi
wire the switch ports
is that correct?
thanks
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
03-08-2021 01:49 AM
yes - if you are replacing the Master switch ( if that was failed or due to maintenance reason) - the procedure is correct.
for adding a new switch you do not need to reboot the stack until your intention put back switch1 as the master switch.
make sure you have enough downtime for the stack to reboot.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
03-08-2021 02:08 AM
ok thanks.
yes, for readability reasons, we want the master to always be the first switch at the top of the stack.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
03-08-2021 03:49 AM - edited 03-08-2021 10:34 PM
Hello Beaurr
FYI - Just to be clear - If the a switch fails (master or otherwise) the replacement method is just the same- you DONT need to reload the whole stack for a master failed switch to be replaced, it just won’t come back as the master Also you would not need to reload the whole stack just for the failed master to become the master again, unless you rest the master to be exactly the same prior to the master failure.
@Beaurr wrote:
yes, for readability reasons, we want the master to always be the first switch at the top of the stack.
Also it is recommended to designate the master/standby switches to be those that don’t have any uplink interconnects obviously this would be when you have more two switches in a stack, The theory being any failure to a uplink switch(s) wont incur master switch functionality failover at the same time, or if you have a failure of a master you don’t lose uplink connectivity or incur link convergence.
Please rate and mark as an accepted solution if you have found any of the information provided useful.
This then could assist others on these forums to find a valuable answer and broadens the community’s global network.
Kind Regards
Paul
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
03-08-2021 09:34 AM
Thanks for your help