03-03-2015 04:46 AM - edited 03-07-2019 10:55 PM
Hi Community,
I have a stack of 3750G and i want to replace the master switch priority 15 coz of faulty port .
And I receive new switch from cisco WS-C3750X-24
Switch Ports Model SW Version SW Image
------ ----- ----- ---------- ----------
* 1 30 WS-C3750X-24 12.2(55)SE4 C3750E-IPBASEK9-M
If I connect a new blank 3750X through the stack ports, will the OLD switch sync its config to the new one without causing problems? or i need to change switch only
Switch Ports Model SW Version SW Image
------ ----- ----- ---------- ----------
* 1 24 WS-C3750G-24T 12.2(55)SE4 C3750-IPBASEK9-M
2 24 WS-C3750G-24T 12.2(55)SE4 C3750-IPBASEK9-M
I change IOS of new switch to c3750e-ipbasek9-mz.122-55.SE4.bin
Please help me with this.
Awaiting your reply.
Solved! Go to Solution.
03-03-2015 02:39 PM
I am presuming switch 1 is the one you want to replace? If yes, then this is the most "easiest" methodology to do so:
1. Power down switch 1;
2. Remove the stacking cable;
3. Remove switch 1 appliance;
4. Install new 3750X;
5. DO NOT POWER UP new 3750X;
6. Connect stacking cable; and
7. Power up the new 3750X.
Done. Nice and easy.
03-04-2015 06:28 AM
Hello Mayur,
Please ensure ensure the new switch is running the same (or at least compatible) software. You may need to renumber the new switch once it is in place.
i hope it helps.
Jatinder Sharma
9971226722
03-03-2015 02:39 PM
I am presuming switch 1 is the one you want to replace? If yes, then this is the most "easiest" methodology to do so:
1. Power down switch 1;
2. Remove the stacking cable;
3. Remove switch 1 appliance;
4. Install new 3750X;
5. DO NOT POWER UP new 3750X;
6. Connect stacking cable; and
7. Power up the new 3750X.
Done. Nice and easy.
03-03-2015 11:39 PM
hi Leo Laohoo,
thankx for the reply,
and one more thing i want to conform that about IOS coz in my live switch having this version
Switch Ports Model SW Version SW Image
------ ----- ----- ---------- ----------
* 1 24 WS-C3750G-24T 12.2(55)SE4 C3750-IPBASEK9-M
2 24 WS-C3750G-24T 12.2(55)SE4 C3750-IPBASEK9-M
and new 3750X having
Switch Ports Model SW Version SW Image
------ ----- ----- ---------- ----------
* 1 30 WS-C3750X-24 12.2(55)SE4 C3750E-IPBASEK9-M
So this cause any issue???
03-04-2015 03:28 AM
All units are running IP Base Feature set. IOS version is 12.2(55)SE4.
I see no issues there.
03-04-2015 06:28 AM
Hello Mayur,
Please ensure ensure the new switch is running the same (or at least compatible) software. You may need to renumber the new switch once it is in place.
i hope it helps.
Jatinder Sharma
9971226722
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide