08-10-2011 08:09 AM - edited 03-07-2019 01:38 AM
Hello All,
We have an existing 3750 serving the users in layer 2 configuration. Another 3750 is to be added as stacked switch to this.
from current switch:
Switch# Role Mac Address Priority State
--------------------------------------------------------
*1 Master 002c.2d5b.6a00 1 Ready
If the existing switch is the master, do i need to change or configure any priority related thing on the new switch to be stacked? I think one with highest priority (15)
will take over as master.
please help..thanks.
Solved! Go to Solution.
08-11-2011 08:40 AM
HI,
let us say there are two switches A & B.
A is having the priority of 9
B is having the priority of 8
If we want to add another switch in the stack, check the priority of the switch before joining. It should not be greater than 9. If it is greater than 9 then it will become the master after we issue the reload.
++ Also the stack master election will take place only if the reload is issued from the master switch.
++ unless and until you reload the entire stack, the priority wont take effect eventhough it is configured on the switch.
Hope this answers your query.
Cheers
Somu
Pls rate helpful answers.
08-10-2011 08:36 AM
Hi,
This document might interest you:
If the new switch has to be added as a master, then
Change the priority value of the switch to be added to a value greater than the highest priority of the stack. Highest being 15.
switch04-09-2020 06:48 AM
If I have the following considering Cisco 3650-24-PS and PD
Switch 1 priority 15
Switch 2 priority 10 my upling is here TenGig2/1/3 and I want to convert this to be Te1/1/3, in other words I wan to convert switch 2 in 1.
switch 1 renumber 3
switch 1 priority 8
switch 2 renumber 1
switch 2 priority 15
switch 3 renumber 2
Doing that, I'll loose all interfaces configurations in the current interfaces Gi1/0/1-24?
08-11-2011 08:40 AM
HI,
let us say there are two switches A & B.
A is having the priority of 9
B is having the priority of 8
If we want to add another switch in the stack, check the priority of the switch before joining. It should not be greater than 9. If it is greater than 9 then it will become the master after we issue the reload.
++ Also the stack master election will take place only if the reload is issued from the master switch.
++ unless and until you reload the entire stack, the priority wont take effect eventhough it is configured on the switch.
Hope this answers your query.
Cheers
Somu
Pls rate helpful answers.
04-09-2020 08:29 AM
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide