What do i need to do first when i replace a line card WS-X6748-SFP on a 6509 that is operating in VSS

Jacob Gwangwa
Level 1
Level 1

I urgently want to replace a faulty line card WS-X6748-SFP with a new one. The switch concern is a 5609-V-E operating in Virtual Switching System mode.

How long do you suggest the down time will be?

1 Reply 1

Reza Sharifi
Hall of Fame
Hall of Fame

Since the module is hot swapable, when you insert the new module, it goes through the diagnostic test and bring the module on line.  I would say about 5 minutes of down time max, if you do not turn off the chassis.

HTH