05-28-2008 08:21 AM - edited 03-05-2019 11:16 PM
I am looking for documentation, or "How Tos" for writing macros for scheduled actions on a 3750G-24PS-S switch.
Specific need is to shutdown all AP connected ports at a predetermined time, and start them up again around 8 hours later.
Thank you....
05-28-2008 09:23 AM
This will not be achieved by the Macros. You can achieve it with time-based POE EEM script on 3750's. You need to upgrade the switches to the latest 12.2.46SG image and configure the time-based POE script.
Please download the script from the link below :
Look for 6500 Green Power EEM script.
HTH,Please rate if it does.
-amit singh
05-28-2008 10:10 AM
Amit,
Thank you... Got the download. It will be two months before I get the new switches, load the new image, and test.
This tells me we can do it. That is what I needed for now.
Thank you,
Philip Siegling
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide