cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
418
Views
0
Helpful
2
Replies

Writing Macros for a 3750 stack

psiegling
Level 1
Level 1

I am looking for documentation, or "How Tos" for writing macros for scheduled actions on a 3750G-24PS-S switch.

Specific need is to shutdown all AP connected ports at a predetermined time, and start them up again around 8 hours later.

Thank you....

2 Replies 2

Amit Singh
Cisco Employee
Cisco Employee

This will not be achieved by the Macros. You can achieve it with time-based POE EEM script on 3750's. You need to upgrade the switches to the latest 12.2.46SG image and configure the time-based POE script.

Please download the script from the link below :

http://forums.cisco.com/eforum/servlet/EEM?page=search_results&fn=search&catId=0&count=20&skip=0&sortBy=3&order=DESC&mode=browse

Look for 6500 Green Power EEM script.

HTH,Please rate if it does.

-amit singh

Amit,

Thank you... Got the download. It will be two months before I get the new switches, load the new image, and test.

This tells me we can do it. That is what I needed for now.

Thank you,

Philip Siegling