cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
643
Views
5
Helpful
2
Replies

Collaboration Infrastructure Boot Sequence

Given the devices below can anyone give me some advice on proper boot sequence?

 

Edge
UCUM
TFTP Subs
Conductor
Expressway C
Sip Trunk

2 Replies 2

Jonathan Schulenberg
Hall of Fame
Hall of Fame

There are no mandatory-or-the-world-will-end boot order requirements of the products you listed. If I were doing it, this is roughly the order I would follow:

1. CUCM Pub

2. CUCM Sub(s)

3. CUBE to PSTN

4. Expressway-E

5. Expressway-C

6. Conductor & subordinate MCUs/TPS

 

Thanks Jonathan for the Reply!