Can anyone tell me how long it should take to unbox an MX800 (single screen) endpoint and mount on a floor stand (wall supported so needs holes drilling in wall) please? The network and servers will be pre-configured. I am just looking for the engineering time to unbox, assemble and install one to calculate how many a team of engineers can install on the same site per day. Does anyone have experience of assembling MX800s to give me a realistic answer please? Configuration will be done remotely. I cannot find any mention in the install guides apart from it recommends 4x people to lift one.