06-17-2019 01:12 AM
Hi Experts,
Customer is about to add more users (3700) to CUCM cluster (based on template 7500), so I think there are two ways.
Current version on CUCM is 10.5 and they also want to make upgrade to 11.5/12.5.
Option I.
CUCM VM template 10.5
CallCtrl: 7,500 users | 2 | 6 GB | 1 x 110GB | 1 |
CallCtrl: 10,000 users | 4 | 6 GB | 1 x 110GB | 1 |
CUCM VM template 11.5/12.5
CallCtrl: 7,500 users | 2 | 8 GB | 1 x 110GB | 1 |
CallCtrl: 10,000 users | 4 | 8 GB | 1 x 110GB | 1 |
Can I just modifiy the existing VM templates for each of the CUCM (1 PUB, 2x SUBs)
> by increasing vCPU (2 >> 4)
> and vRAM (6 >> 8)
if this is fine I think after that PCD can be use to make CUCM Cluster upgrade.
The Cluster also has two IM&P servers based on 5000 user tample.
IM&P 10.5.2
5000 users (Full UC) | 2 | 4 GB | 2 x 80GB | 1 |
15000 users (Full UC) | 4 | 8 GB | 2 x 80GB | 1 |
IM&P 11.5/12.5
5000 users (Full UC) | 2 | 4 GB | 2 x 80GB | 1 |
1500 users (Full UC) | 4 | 8 GB | 2 x 80GB | 1 |
Can I just modifiy the existing VM templates for each of the IM&P servers
> by increasing vCPU (2 >> 4)
> and vRAM (4 >> 8)
if this is also fine I think after that PCD can be use to make IM&P upgrade as well.
Option II.
alternatively more servers can be added (to increase capacity) to the existing cluster with PCD, but the CUCM still needs the vRAM to be amended from 6GB to 8GB and need of course resource on the host device (this can not be done PCD, still need to amend VM template first, if Iam correct on it.
Am I correct on the options here?
Many thanks,
Tibor
06-17-2019 04:59 AM
06-17-2019 05:45 AM - edited 06-17-2019 05:49 AM
Hello Jonathan,
Yes, you are right on the number of nodes for CUCM
(Actually 1 pub, 2x sub, 1x TFTP there is no secondary TFTP)
Option II - adding servers instead of increasing VM template for CUCM and IM&P - can also be a valid option here?
Apart from CUCM and IM&P customer has PLM, CUC (2x servers) and UCCX (2x servers 300>400 required)
I need to do DRS on CUC and UCCX since only newly built template is recommended and supported for them changing VM template for these applications.
After having the correct VM Template for all the servers PCD can do upgrade task for me to complete?
Many thanks,
Tibor
06-17-2019 08:38 AM
Yes, you can do what you are mentioning. Upgrade resources and then upgrade the cluster. PCD will make the process a bit easier as you have mentioned.
Moving to the 12.# versions will require a move to smart licensing as well. It's not a difficult process, but you need to be aware.