That depends, some people actually buy 2 x CMS 1K and then install the 3rd server for DB only on existing servers.
You can obviously install the 3 servers in the 2 C series, but then you'd lose either 1 or 2 of them at the same time depending on which one goes down.
HTH
java
if this helps, please rate