CUCM and UCCX 8.5 migration to another site

alemunmo81
Level 1
Level 1

Hello everybody!

 

I have a CUCM and UCCX centralized cluster.

 

Current software versions:

2 MCS x CUCM – 8.5.1 SU4

2 MCS x UCCX – 8.5.1 SU4

1 MCS x Unity Connection - 8.5.1 SU4

 

Considerations :

- Migrate CUCM and UCCX HAoLAN cluster from single site to another site 

- RTT between Datacenter is 50ms 

- Each datacenter has its own network 

-changing HA deployment type to WAN temporarily while is migrated all the servers

 

My question here is what should be the best procedure and what i should consider further for this migration?, For example: What i should do with respect to the licensing if i change the ip addressing.

 

I would greatly appreciate your help.  

 

Thanks, 

 

Alexis 

1 Reply 1

Aman Soi
VIP Alumni
VIP Alumni

Hi Alexis,

 

Nothing would change for licensing since you have got applications installed on MCS servers .The licenses would be binded using physical MAC address of server.

Do check for ports in firewall for DB replication between servers across WAN.

regds,

aman