12-07-2013 12:40 PM - edited 03-19-2019 07:37 AM
All -
I'm having considerable issues upgrading a single node CUCM 7.1(5) server to 9.1(2). The upgrade kicks off without an issue and runs for several hours. When I return, the server has rebooted and found back at the 7.1(5) prompt.
The only semi-revealing item is found in the critical.log which says:
"/usr/local/cm/script/cm-dbl-ontape_backup-install RU PostInstall 9.1.2.10000-28 7.1.5.31900-3 /usr/local/cm/ /common/component/database /common/log/install/capture.txt " terminated. Exceeded max time (240)
A few notes:
I'm considering an upgrade to CUCM 8.0 or 8.5 before going to 9.1(2). However, I'm pretty cynical that anything major revision will change the behavior.
Does anyone have a suggestion?
Matthew Berry | Solutions Architect, CCIE #26721 (Voice)
World Wide Technology, Inc. | +1 612-219-0040
PS Engineering: Innovate & Ignite
12-08-2013 09:26 AM
Id free some horsepower on the server where you are doing the upgrade and try again, and jump upgrade is only supported to 9.1(2), you can also wait for 10.x and use PCD
Sent from Cisco Technical Support iPad App
05-25-2014 10:17 AM
I had the same problem and the solution to it was deleting the tape backup device that was configured on CUCM Dissaster Recovery. After deleting it the upgrade went well.
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide