cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
3784
Views
0
Helpful
9
Replies

Chassis power error and time

ADAman
Level 1
Level 1

major,F0408,117295,sys/chassis-1/fault-F0408,power-problem,2012-08-08T13:45:12,Power   state on chassis 1 is redundancy-failed

what does this mean? Both the power cables are connected, and they have status "Operable" in Chassis Power GUI.

Other than that, no faults.

Is it possible to set the time without using NTP? Do I have to set time from NX-OS command-line?