UCS c210 cable management arm

ai.solutions
Level 1
Level 1

Hi UCS community,

I was hoping that some of you could shed some light on the cable management arm installation.

I have it installed correctly, however it doesnt appear to fit the APC netshelter rack very well with the vertical PDU's installed in the rear.

It also doesnt appear to matter what position the rear rack uprights are adjusted to. I end up with the back of the cable arm hitting the power cords plugged into the vertical PDU. Does anyone else have any experience with this? There doesnt seem to be any adjustment I could make which would resolve this.

FYI, I have two HP DL 380's with cable arms installed and they fit perfectly fine.

1 Reply 1

abbharga
Level 4
Level 4

Hi,

Did you have a look at the following hardware installation guide for the C210 server to see if it provides any input:

http://www.cisco.com/en/US/docs/unified_computing/ucs/c/hw/C210M1/install/install.html

./Abhinav