Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Hey there,I am trying to create a stackwise virtual setup with 2 x C9500-24Y4C through the meraki dashboard.When i am connecting my 2 interfaces dedicated for the SVL and 1 interface for the DAD, STP kicks in and blocks the 3 ports on the 9500-2 then...
Hello,I have a design question, we are planning to implement a new Meraki infrastructure with the following devices :- 2 x MX450- 2 x C9300X-12Y-M- 2 ISP- some access switches - some Access Pointswe have been asked to add 2 additional and dedicated «...
Hello,
I have a question regarding the migration of an existing 9800 WLC within an SDA Fabric.
Our current setup includes:
- 2 x 9800-40 WLCs (In SSO) configured as Primary Managed AP Locations,
- 1 x C9800-CL configured as Secondary Managed AP Locat...
Hi there,
We have standard SDA design with a fabric site including 2 border nodes with some intermediate nodes and edge nodes connected behind.
The problem is we have one border node configured as anywhere and the other one as external.
We plan to co...
Hello team,
I have a concern regarding the migration from traditional network to SDA, especially for the wireless part.
This will be a full migration as we have 9k switches and 9k APs that we will convert to SDA. We have the 2 border / control plane ...
Ok, I converted interfaces to L3 (actually I thought it was not possible from the meraki dashboard).Tomorrow I'll give a new try for creating the stackwise virtual.Thank you,
Yes, I have selected interfaces Tw1/0/21 and Tw1/0/22 for SVL and Tw1/0/23 for DAD on both 9500. After some time when the dashboard is trying to build the stackwise virtual, i get the following error message :
Hello,Yes I faced this issue and this is due to the CLI command "pnp startup-vlan XXX" on the border nodes.When starting the LAN Automation, Catalyst Center will send the "no pnp startup-vlan XXX" to the border nodes to prevent new switches to get an...
Hopefully we agreed to invest in 2 additional 9500 switches in Stackwise Virtual for the LAN side.Then it should be easier as we'll have 2 dedicated WAN switches for ISP redundancy and 2 dedicated LAN switches for aggregating Access switches.