Hello,
I am wondering if there has been any changes in the Prime Infrastructure 1.2 Lifecycle license device count requirement with regard to Cisco stackable switches. For instance, I have a stack of 8 3750X switch with one IP address. Do I need one device license like LMS, or do I need 8?
Thanks.