I am installing a second WiSM blade on a redundant (backup)6509. The A&B side of the produciton WiSM were spec'd to run <= 300 APs.
How does one configure these control units so that production runs on WiSM blade 1 and fails over to WiSM blade 2 on the redundant 6509?