10-25-2015 11:48 PM - edited 03-14-2019 03:23 PM
Gents,
I have installed CIM 9.0.2 with ES5 and trying to integrate it with CCE 10.5.1. Every thing has been setup however while trying to start EAAS process in CIM it gives me the attached error that "EAAS process can't be started as ECC variable failed to register". In Listener process i am not able to see the Agent PG as well.
Any thoughts what am i missing.
Thanks in advance
10-26-2015 02:13 AM
The error is elf explanatory, Check your ECC config and see if they are correctly configured as per config guide. if yes try to bounce PG for it to load new config and see if it works.
10-26-2015 02:26 AM
I have checked the variable configs as per the guide but still unable to fetch variables. You can check the EAAS log file
10-26-2015 02:32 AM
can you attach the snap of ECC config and did you try bouncing of MR PG(exit_opc)?
10-26-2015 03:14 AM
Find answers to your questions by entering keywords or phrases in the Search bar above. New here? Use these resources to familiarize yourself with the community: