We have one pair of N5K's and planning on migrating them to a pair of N9K's.
I am not Network engineer, but I am seeking for steps to migration without downtime, as detail as possible.
What I can think of is that join these two N9K's in fabrics first, then move one cable connection from N5K to N9K at one time, is that a good approach?
Thanks in advance!
08-14-2018 01:46 PM
08-16-2018 01:55 PM
If you have hosts that are dual homed and you are using vPC to those hosts, do not try and move one cable at a time to the new 9k's. That will not work. You can certainly build them in parallel, copy the port configs over then move servers. Watch out for vPC domain numbers and spanning tree stuff.