We have a IPT Migrate project, The CUCM version is 7.1.5 and the Unity Connection version is 7.1.3
We will upgrade the system to 8.6(2) version.
My question is:
I know we can export/import the DB from customer IPT system to lab system, but can we temporary build the CCM7.1.5 and CUC7.1.3 on UCS-C220M3S?
It means we can import the DB into UCS-C220M3 (IPT 7.1.X) and then make a L2 upgrade to 8.6.
Thanks!