cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
3291
Views
5
Helpful
2
Replies

Problem configuring VWIC2-1MFT-T1/E1 on 2921 Router

slctest123
Level 1
Level 1

Greetings all.  I'm new to the CISCO community and need help with configuring a VWIC2-1MFT-T1/E1 card on a 2921 router in my lab.  I've followed the configuration steps for the card, but when I run the sh controller command, it shows 'down'.  My configuration steps are shown below.  Any help would be appreciated.

Thanks in advance

--Roland

card type t1 0 2

controller T1 0/2/0

framing SF
clock source internal
linecode ami
cablelength long 0db
ds0-group 0 timeslots 1-6 type e&m-immediate-start dtmf dnis
ds0-group 1 timeslots 7-12 type e&m-wink-start dtmf dnis
ds0-group 2 timeslots 13-18 type fxs-ground-start
ds0-group 3 timeslots 19-24 type fxs-loop-start

1 Accepted Solution

Accepted Solutions

mvsheik123
Level 7
Level 7

Hi,

have you connected the T1 port to service provider or if in lab, a simulated environment? You need the physical connection with proper configs to bring up the T1.

hth

MS

View solution in original post

2 Replies 2

mvsheik123
Level 7
Level 7

Hi,

have you connected the T1 port to service provider or if in lab, a simulated environment? You need the physical connection with proper configs to bring up the T1.

hth

MS

Thank you for your response.  Yes, I did have a T1 connected.  My problem was that I needed a cross-over cable between our lab's T1 cable and the router.

--Roland

Review Cisco Networking for a $25 gift card