Server Networking

cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Cisco UCS X-Series Energy Efficiency Offer

 

Forum Posts

Dear Community, We experienced an unusual behavior of two Nexus 7000 switches within a vPC domain.According to the attached sketch, we have four N7Ks in two data centers - two Nexus 7Ks are in a vPC domain for each data center.Both data centers are c...

Hi!I have a questions about Cisco Adapter FEX and VM Fex.As i understand, Cisco Adapter FEX gives multiple vNIC on one mezzanine card, and each of them appears as virtual port on Fabric Interconnect.Also, same thing for VM-FEX, each VM NIC appears as...

Good afternoon,I was wondering if someone might be able to help,  I have an interesting setup which I am working with at the moment which consists of 4x Nexus 55xx switches running HSRP for around 4 VLAN's. What we are looking to do advertise routes ...

Jim R by Level 1
  • 1676 Views
  • 3 replies
  • 0 Helpful votes

I have two 5548UP connected to two Nexus 7k forming double sided vPC design. The 5k is acting as access layer top of the rack and 7k as aggregate. The 7k is configured with vrf contexts and vlans with vrrp.I followed the best practices for double-sid...

Hi, Is it possible to use the native 40GE ports on the N7K-M206FQ-23L module for the VPC Peer Link, or do you have to break these ports out into 10GE ? I have read that 10GE ports must be used for the VPC peer link. Thanks in advance.

cbeswick by Level 1
  • 604 Views
  • 1 replies
  • 0 Helpful votes

Hi all,I have to add a vNIC to a blade template. However, I heard that doing that will power cycle all blades that are bound to that template. Is that corect? I only have 1 template (for all VMware server blades). This would power cycle the whole far...