11-01-2019 06:57 AM
Attempting to stack (4) c9300 48 port E licensed IOSXE 16.6.6, licenses and codes match up, provisioned the switches and configured the switch priorities on desired Master and switches in the stack, We keep encountering failed port connections and boot up looping, have tried various combinations of stack cable swaps and cabling configurations as well as timing power up sequences, nothing works, has anyone encountered issues/have suggestions to get these switches to stack?
11-01-2019 07:57 AM
can you post the console logs, please?
is the PSU are same ?
11-01-2019 08:51 AM
11-01-2019 09:07 AM
11-01-2019 01:49 PM
Hello
can you post the following :
show switch detail
dir flash:
show boot
show switch stack-ring
11-01-2019 02:29 PM
11-01-2019 02:53 PM
Glad here that that lot of cables were the same batch.
hope you the solutions resolved now.
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide