I have 2 two-switch 3750 stacks, which i will be combining into one 4 switch stack. All 4 are running the same IOS, and presently each stack is has priority 15 and 1, respecitvely. One master will continue to be 15, and the others will be slaves. Looking for best practices as to how to do this. Should I demote the master of stack #2 before joining both to stack #1?

thanks

2 Replies 2

Edison Ortiz
Hall of Fame
Hall of Fame

Yes, you can do that. With that said, there is a good document on how to add a provisioned switch into an existing stack.

There are several factors that come into play and being a master is the least of your problems, please see:

http://www.cisco.com/en/US/docs/switches/lan/catalyst3750/software/release/12.2_46_se/configuration/guide/swstack.html#wp1178950

HTH,

__

Edison.

Thanks for the doc.