cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
272
Views
3
Helpful
2
Replies

Config in stack mode

foued kh
Level 1
Level 1

Hi all,

I have to add a new catalyst 3650 to an older one already configured so they will be in stack mode.
My question is : 

Need I configure the second switch with the same configuration of the first switch (interface switchport, routing intevlan, creation of VLAN) or just configure the stacking between the 2 switches and the configuration will be copied to the newer switch added ?

Thank you for support.

1 Accepted Solution

Accepted Solutions

Mark Malone
VIP Alumni
VIP Alumni

Hi

 you want to make sure the switch in production is set as master pri 15 or the new switch could take over and reboot the stack as it forming , once its set as the master it shouldn't get wiped , make sure ios-xe versions are same on both switches to get full feature set when stacked

View solution in original post

2 Replies 2

Mark Malone
VIP Alumni
VIP Alumni

Hi

 you want to make sure the switch in production is set as master pri 15 or the new switch could take over and reboot the stack as it forming , once its set as the master it shouldn't get wiped , make sure ios-xe versions are same on both switches to get full feature set when stacked

THank you so much Mark for advice.

Review Cisco Networking for a $25 gift card