04-13-2022 06:10 PM
Hi All,
As the attached Wiring diagram, We have 3 Cisco catalyst 9300, two at site no. 1 and the other at site no.2 connected with dark fibre.
can we stake the three switches with each other, on-site no1 with the stacking kit and on-site no 2 with the SFP?
Is it impossible? or only two with the stacking kit and the other with the trunking port with the SFP?
Thanks
Solved! Go to Solution.
04-13-2022 06:18 PM
Hi,
Is it impossible? or only two with the stacking kit and the other with the trunking port with the SFP?
The stacking cables are usually up to 3 meters. By default, each switch comes with a 50-centimeter cable. So, if the 2 switches are in closed proximity in site-1 you can stack them and then use the dark fiber and trunk the stack to the other switch in site 2
HTH
04-13-2022 06:18 PM
Hi,
Is it impossible? or only two with the stacking kit and the other with the trunking port with the SFP?
The stacking cables are usually up to 3 meters. By default, each switch comes with a 50-centimeter cable. So, if the 2 switches are in closed proximity in site-1 you can stack them and then use the dark fiber and trunk the stack to the other switch in site 2
HTH
04-13-2022 07:07 PM
No stacking can be done here, you can port-channel or trunking for Layer 2
04-13-2022 10:49 PM
Hello
The distance is irrelevant tbh the stack and single switch will just see each other as an interconnected trunk, so yes it is viable.