10-06-2012 04:34 PM - edited 03-07-2019 09:19 AM
Hi Everyone,
Need to confirm below
when we do sh spanning tree vlan on switch
Port 12 (FastEthernet0/12) of VLAN0020 is root forwarding
Port path cost 19, Port priority 128, Port Identifier 128.12.
Designated root has priority 24596, address 000d.28bc.fd80
Designated bridge has priority 24596, address 000d.28bc.fd80
Designated port id is 128.12, designated path cost 0
Timers: message age 16, forward delay 0, hold 0
Number of transitions to forwarding state: 1
Link type is point-to-point by default
BPDU: sent 6, received 85529
Port 12 is going to root bridge.
Need to confirm below
designated cost 0 does this mean cost to reach switchs own port 12?
thanks
mahesh
Solved! Go to Solution.
10-06-2012 05:59 PM
Hi Mahesh,
designated cost 0 does this mean cost to reach switchs own port 12?
That is correct. The cost to switch itself is 0. If you go to the next switch that is connected to this switch via Fast Ethernet, the cost should be 19.
HTH
Reza
10-06-2012 05:59 PM
Hi Mahesh,
designated cost 0 does this mean cost to reach switchs own port 12?
That is correct. The cost to switch itself is 0. If you go to the next switch that is connected to this switch via Fast Ethernet, the cost should be 19.
HTH
Reza
10-20-2012 10:52 AM
Hi Reza,
Thanks again for your help.
Sorry for late reply
Regards
MAhesh