Hi all,
Our client having one c3750 with ipbase license switch.They are connected server and end switches to that switch.Our customer want to increase the speed to accessing the server at that time I am told to use etherchannel.Customer happy about this and implement the etherchannel configuration.Now i need some configuration assistance to configure etherchannel upto 4 physical link.server are connected on port no Ge1/0/10,they want to bind four phical link GE1/0/10-13.how to configure etherchannel in this switch?