05-02-2018 08:54 PM - edited 03-08-2019 02:52 PM
Hi,
we are currently using 2 X 3750 switches. but, these model are quite old so we are going to replace it with 2 X 3850 stack switches.
Upper 3750 is the master as high priority than bottom 3750.
If we shutdown upper master 3750 as power off, then, bottom 3750 will take over the master role? and no issue with traffic allowing bottom 3750?
if it is working, then we will replace the 3750 to 3850 one by one as minimized downtime during the replacement.
Solved! Go to Solution.
05-03-2018 04:58 AM
05-03-2018 12:15 AM
@syjeon wrote:
If we shutdown upper master 3750 as power off, then, bottom 3750 will take over the master role? and no issue with traffic allowing bottom 3750?
This should work.
05-03-2018 04:58 AM