05-20-2022 09:29 AM - edited 05-20-2022 09:29 AM
Hi,
I have a stack of two cisco 9300-48p in production.
Switch# Role Mac Address Priority Version State --------------------------------------------------------- *1 Active xxxx.xxxx.xxxx 15 V03 Ready 2 Standby yyyy.yyyy.yyyy 13 V03 Ready
I need to replace the second 9300-48p with a 9300-24P.
Is it okay if I do it like this :
On the master 9300-48p :
Power on the 9300-24p (not connected with stack cable)
Thank you.
Solved! Go to Solution.
05-20-2022 09:42 AM - edited 05-20-2022 09:53 AM
You can turn off second switch, remove the provision wth model if confifgured.
remove the stack cables
On New 24 port swich, make sure it has same IOS code as masster switch,
Prepare the switch with console vable - change switch number 2 and priority 14 offline, wr config.
connect cable to master switch, and power on that should work
Note you have same simlar step, i change only priority 14 to be in line and version code to be same always..
05-20-2022 09:41 AM
Way to go!!
05-20-2022 09:42 AM - edited 05-20-2022 09:53 AM
You can turn off second switch, remove the provision wth model if confifgured.
remove the stack cables
On New 24 port swich, make sure it has same IOS code as masster switch,
Prepare the switch with console vable - change switch number 2 and priority 14 offline, wr config.
connect cable to master switch, and power on that should work
Note you have same simlar step, i change only priority 14 to be in line and version code to be same always..
05-20-2022 10:05 AM
Hi,
The procedure you have here should work. Just make sure the new switch has the same exact IOS and license level as the master before you make the change.
HTH
05-29-2022 10:56 AM
Thank you!
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide