- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
01-11-2021 03:34 AM
Hi All,
we have 3 New 9300-48P devices to stack, I have gone through the stacking architecture documents. But still want to reconfirm.
Step 1: IOS upgrade
Step 2: Console each switch and Configure Stack priority
Step 3: Hardware stack cabling and racking.
Step4: configuration and implementation.
What will happen if I hardware stack cable all 3 devices and configure the SW priority from single console ?
Thanks
KM
Solved! Go to Solution.
- Labels:
-
LAN Switching
Accepted Solutions
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
01-11-2021 03:40 AM - edited 01-11-2021 03:43 AM
the proceedure same as mentioned 1-4 steps , you can re-number or repriority once stacking can also be done - for the best take effect you need to reboot.
always conside to split the uplink Switch1 and Switch2 (they master and slave) so the link maintainined for the uplink.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
01-11-2021 03:40 AM - edited 01-11-2021 03:43 AM
the proceedure same as mentioned 1-4 steps , you can re-number or repriority once stacking can also be done - for the best take effect you need to reboot.
always conside to split the uplink Switch1 and Switch2 (they master and slave) so the link maintainined for the uplink.
