cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
740
Views
5
Helpful
1
Replies

Switch Stacking

KM2018
Level 1
Level 1

Hi All,

 

we have 3  New 9300-48P devices to stack, I have gone through the stacking architecture documents. But still want to reconfirm.

 

Step 1: IOS upgrade 

Step 2: Console each switch and Configure Stack priority 

Step 3: Hardware stack cabling and racking.  

Step4: configuration and implementation. 

 

What will happen if I hardware stack cable all 3 devices and configure the SW priority from single console ?

 

Thanks 

KM

1 Accepted Solution

Accepted Solutions

balaji.bandi
Hall of Fame
Hall of Fame

the proceedure same as mentioned 1-4 steps , you can re-number or repriority once stacking can also be done  -  for the best take effect you need to reboot.

 

always conside to split the uplink Switch1 and Switch2 (they master and slave) so the link maintainined for the uplink.

 

https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-9300-series-switches/white-paper-c11-741468.html

 

BB

***** Rate All Helpful Responses *****

How to Ask The Cisco Community for Help

View solution in original post

1 Reply 1

balaji.bandi
Hall of Fame
Hall of Fame

the proceedure same as mentioned 1-4 steps , you can re-number or repriority once stacking can also be done  -  for the best take effect you need to reboot.

 

always conside to split the uplink Switch1 and Switch2 (they master and slave) so the link maintainined for the uplink.

 

https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-9300-series-switches/white-paper-c11-741468.html

 

BB

***** Rate All Helpful Responses *****

How to Ask The Cisco Community for Help

Review Cisco Networking for a $25 gift card