04-28-2011 04:13 AM - edited 03-06-2019 04:49 PM
I have (2) 6509 Core switches, (4) 4506 and (2) 4503 edge switches. Would like to upgrade to 10GB, provide redundancy (no single point of failure) and link aggregation (for maximum throughput).
What supervisor modules should I purchase? GBIC\SFP's should I use? Firmware and IOS levels?
And any other thoughts.
04-28-2011 05:43 AM
For 6509 you will need a Supervisor 720
For 4500 you will need a SUP2+10GE or better
http://www.cisco.com/en/US/products/ps6711/index.html
Please rate helpful posts.
04-28-2011 09:17 AM
For the (2) 6509, I have the 720 3B and I have a WS X6416 GBIC, with 16 ports. Currently, have a port channel for (4) 1GB ports between 6509's. Would like to make this (4) 10GB port channel between the 6509's.
For the (4) 4506, I have the WS X4013+ Sup Eng II plus with 2 ports. Currently, have (1) 1GB port going to each 6509. Would like to make this a port channel with (2) 10GB port channel to each 6509. So I would need a module with a minimum of (4) ports per 4506.
For the (2) 4503, I have the WS 4013+ TS Sup Eng II with 8 SFP ports. Currently, have (1) 1GB SFP going to each 6509. Would like to make this a port channel with (2) 10GB port channel to each 6509. So I would need a module with a minimum of (4) ports per 4503.
Does this configuration work?
04-28-2011 06:25 PM
Would like to upgrade to 10GB, provide redundancy (no single point of failure) and link aggregation (for maximum throughput).
I'm sooooo going to get flak with this. Here goes.
DON'T purchase anything for your 6500 yet. The reason is because in mid-June 2011 Cisco, during the Cisco Live 2011 Las Vegas, will announce the new VS-Sup2T. It's the new supervisor engine of the 6500 that will support up to 2Tb.
Currently, the Sup720 will support the following 10Gb cards: 6704, 6708 and the 6716. All three cards have Distributed Feature Card version 3 (DFC3). The Sup2T will not support DFC3 and will support the newer DFC4 (because of the new licensing architecture and support pay-as-you-grow). Only the 6704 and the 6716 can be upgraded to the DFC4 but the 6708 has the DFC3 wielded into the motherboard.
So this is why I'm going to recommend to anyone reading this post to consider upgrading to VS-Sup2T.
For the 4500, unless you have the Sup7 card, I wouldn't bother with 10Gb. The earlier models may have 10Gb ports but to push 10Gb falls with the Sup7.
04-29-2011 05:02 AM
Bob is no longer with Connecticut Water. Can you give me some history on
Bob's request?
Vince Gentile
System Administrator
Connecticut Water Company
Direct 860.664.6010
860.669.8630 Ext. 3010
EMail: vgentile@ctwater.com
From: leolaohoo
To: ROBERT JONES
Date: 04/28/2011 09:26 PM
Subject: New message: "Upgrade to 10
ROBERT JONES,
A new message was posted in the Discussion thread "Upgrade to 10 GB":
https://supportforums.cisco.com/message/3347510#3347510
Author : leolaohoo
Profile : https://supportforums.cisco.com/people/leolaohoo
Message:
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide