cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
176
Views
0
Helpful
0
Replies

How does PCD manage the switch versions with V2V

mmoulson2
Level 1
Level 1

I am considering using PCD to upgrade my customer from 12.5 to 15.

I wanted to check how PCD manages the change of versions. When I have done upgrades in the past where the customer wants to maintain service to phones I can upgrade each node in turn, once all are upgraded I can switch versions in turn and allow the phones to re-register.

Its not clear from the documents I have looked at how the process works with PCD? If it is building new version 15 VMs using the same IP addressing I assume PCD will shutdown the old VM before starting the new version 15 to avoid duplicate IP's on the network? Is it done node by node?

0 Replies 0