Dears
attached is the report for the Hyperflex sizer in which the requirement for usable storage is 20 TB and i am getting those but i m surprise from the available core is only 90 hence the i have selected 18 Core * 2 socket processor = 36 Core and i am giving a 3 nodes solution so 36*3=108 Cores, but in the reports i can see available core are only 90
can anybody explain me in the attached reports why it is showing me 90 cores