Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
All - Tried to upgrade 5 2960s Stacks from IOS 15.0(2a)SE9 to the following IOS -
c2960s-universalk9-mz.152-2.E7.bin
Once we did this we were faced with a continuous switch stack reboot on all 5 stacks with the below error output.
Has anyone experi...
Hello -
I am planning on adding a 2960x to an existing 2960s stack and I have read that a requirement to do so is to adjust the stack speed on existing 2690s stack? ie. switch stack port-speed 10
If true, is a stack reboot required after this com...
Hello -
I have 1 existing 2960s switch (15.0(2a)SE9) in prod and I want to create a stack by adding a 2960x 15.2(2)E7.
1 - What is the process to do so? I have read that you need to change the Stack Speed and to adjust the SDM Template for the 2...
Hello - Wondering the stacking modules can be installed on switches already powered up and in operation?For a stack of 3 and 4 switches, does the cabling have to be done in a specific order?If you are creating a stack of 3 standalone prod switches, (...
Hi Anuar
Did you ever find resolution to this issue? We attempted to upgrade out CISCO 2960s stack to 152-2.E7 and experienced the same non-stop reloading. We had to revert back to the original 15.0(2a)SE9 to get the stack working again.
Do you hav...
Hello!
Thanks! Do I need to run the following on the 2960x as well to adjust for the 2960s Stack Speed (switch stack port-speed 10) and adjust for the default SDM template on the 2960x?
Thanks,