I have a 9800 WLC with flexconnect enabled with a number of AP's associated. I am wanting to test the AP upgrade feature to see if it will allow for scheduled or at least staggered updates. Reason is the WLC will serve as a head end for remote sites. I am wanting to know of there is an alternative to having all remote sites upgrading at same time if WLC is upgraded
I