03-03-2023 08:38 AM - edited 03-03-2023 08:39 AM
We have a NCS-5504 with NCSNC57-36H6D-S line card.
We wish to use a 40G optic in one of the ports to provide 4x10G breakout.
From the module notes:
https://www.cisco.com/c/en/us/products/collateral/routers/network-convergence-system-5500-series/datasheet-c78-742016.html
It states for the NCSNC57-36H6D-S that "Quad groups with ports 24-27, 28-31 and 32-35 do not have any restriction on combination of optics."
At the moment, the ports are all "Hun0/0/0/0-35" interfaces. Is there any documentation for the configuration of breakout for these line cards; I believe the "hw-module port-range <>" command may be required?
We only require port (port 35) configured as 4x10G.
03-03-2023 11:15 AM
Take a look at the breakout section here:
https://xrdocs.io/ncs5500/tutorials/ncs5500-things-to-know/#breakout-cable
Sam
03-06-2023 02:16 AM
Thanks for the pointer. It's slightly confusing having a 57-series line card in a NCS5504 chassis. Which command is actually required? I am thinking it's the "hw-module port-range <>" as interfaces need to be renamed?
Is there any specific documentation for this linecard in terms of breakout?
Matt
03-07-2023 07:07 AM
here is an example from our lab:
RP/0/RP0/CPU0:NCS-5504-C-N57#show platform
Tue Mar 7 14:46:01.632 UTC
Node Type State Config state
--------------------------------------------------------------------------------
0/0/CPU0 NC57-24DD IOS XR RUN NSHUT
0/0/NPU0 Slice UP
0/0/NPU1 Slice UP
0/1/CPU0 NC55-24H12F-SE IOS XR RUN NSHUT
0/1/NPU0 Slice UP
0/1/NPU1 Slice UP
0/1/NPU2 Slice UP
0/1/NPU3 Slice UP
0/2/CPU0 NC55-32T16Q4H-AT IOS XR RUN NSHUT
0/2/NPU0 Slice UP
0/3/CPU0 NC57-36H-SE IOS XR RUN NSHUT
0/3/NPU0 Slice UP
0/RP0/CPU0 NC55-RP2-E(Active) IOS XR RUN NSHUT
0/RP1/CPU0 NC55-RP2-E(Standby) IOS XR RUN NSHUT
0/FC0 NC55-5504-FC2 OPERATIONAL NSHUT
0/FC1 NC55-5504-FC2 OPERATIONAL NSHUT
0/FC2 NC55-5504-FC2 OPERATIONAL NSHUT
0/FC3 NC55-5504-FC2 OPERATIONAL NSHUT
0/FC4 NC55-5504-FC2 OPERATIONAL NSHUT
0/FC5 NC55-5504-FC2 OPERATIONAL NSHUT
0/FT0 NC55-5504-FAN2 OPERATIONAL NSHUT
0/FT1 NC55-5504-FAN2 OPERATIONAL NSHUT
0/FT2 NC55-5504-FAN2 OPERATIONAL NSHUT
0/PM0 NC55-PWR-3KW-2HV OPERATIONAL NSHUT
0/PM1 NC55-PWR-3KW-2HV OPERATIONAL NSHUT
0/PM2 NC55-PWR-3KW-2HV OPERATIONAL NSHUT
0/SC0 NC55-SC OPERATIONAL NSHUT
0/SC1 NC55-SC
starting with 100G
Hu0/3/0/8 admin-down admin-down ARPA 1514 100000000
Hu0/3/0/9 admin-down admin-down ARPA 1514 100000000
configured
RP/0/RP0/CPU0:NCS-5504-C-N57(config)#
RP/0/RP0/CPU0:NCS-5504-C-N57(config)#
RP/0/RP0/CPU0:NCS-5504-C-N57(config)#hw-module port-range 8 9 instance 0 location 0/3/CPU0 mode 4x10
RP/0/RP0/CPU0:NCS-5504-C-N57(config)#
Thanks
03-07-2023 07:29 AM
Thanks for the pointers. I think the commands are very hardware-specific, even down to the specific ports.
It suggests the configuration of NC57-36H6D-S of ports 24-35 for 4x10G is achieved via "controller optics <>" commands.
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide