cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
461
Views
0
Helpful
4
Replies

CUCM upgrade from 8.5 to 8.6 or 9

Ihssan Alibouch
Level 1
Level 1

Hi,

Can anyone tell me if the upgrade of the cucm from 8.5 to 8.6 or 9.0 is free or I need to purchase something?

By the way, I have a smartnet that covers my cucm 8.5 installed on a MCS server

Thx in advance

Ihssan

4 Replies 4

Aman Soi
VIP Alumni
VIP Alumni

Hi,

For Call Manager minor upgrade from 8.5 to 8.6 , u need to have Valid ESW contract.

For Call Manager major upgrade 8.x to 9.x, u need to have ESW along with UCSS contract.

regds,

aman

yes for 8.6 , it is ok if you have ESW

for 9.x, you can order an upgrade from ur partner or it'll be ok if you have UCSS

Regards

Haitham

Thank you guys

Ihssan

Hi,

You need to have ESW contract as well for UCSS to order.

After u place the order, u would get PAKs through e-delivery.

Please rate the posts.

regds,

aman