Switching

Discuss Catalyst brand switches with peers and experts.
cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Labels

Forum Posts

Hello, We have some C3850 switches all of which have sufficient power supplies to support UPOE.  I have a couple questions about the configuration of POE. 1. Is there anything special I need to do to enable the UPOE functionality or does it just happ...

I have a weird issue that I need assistance with.  We have a 6807 that we have been using to make a many to one NAT for our classroom.  Relevant information included below:   interface Vlan90 ip address 192.168.122.1 255.255.255.0 ip nat inside! inte...

Hello, When the system jumbo mtu is set at 9216, do we still have to configure mtu as 9216 at per port/ port-channel level? All ports in L2 mode. NXOS version is 7.0(3)I1(3)

I have cisco catalyst L2 switch as a access switch for my servers & storage Recently i encounter STP issue with the switch  Attached is my switch log screenshot and my both access switches configuration, can someone explain to me anything that i miss...

Hi All,   I have an odd issue with OSPF and ASAv.    If i create 3 ASAv's in serial I can get OSPF up and working with no problem routes pass all the way along.   If I try to connect a physical switch/router or an NSX edge device I get a very odd iss...

shorea50 by Level 1
  • 593 Views
  • 0 replies
  • 0 Helpful votes

Has anyone tried this on a isr4451 router? According to cisco documentation , the buffer size need not be configured. What are the complications that the capture might not have been stopped and router run out of memory?   Another question I have is ,...

Hi All, I have apic firmware different than for Spine and leaf, so APIC can't to discover the leaf and spine. i want to upgrade leaf and spine via cli using usb. can anyone provide me the procedure how to upload the firmware on leaf and spine then bo...

Steev112 by Level 1
  • 5410 Views
  • 1 replies
  • 0 Helpful votes

I have two nexus 7010 switches that I would like to add additional blades to. The problem is that in Power-supply redundancy mode, I do not have enough power with two 6KW power supplies. My power requirements would be a bit over 6.5KW.  I do have add...

I've installed two spine Nexus 9504's, with two leaf 93180Y.  I have HSRP between the two Nexus cores.  I have one 40g connection to each Nexus core from each of the leaf switches.  They are in vPC configuration.  Everything is showing as it should. ...

Dan Man by Level 1
  • 1332 Views
  • 3 replies
  • 0 Helpful votes