I'm building a new access layer switch on a collapsed core model, and I'm pondering what would be the best way to cable the uplinks. Most diagrams look like this: SW1 -> Core1 SW1, Core2 SW1 SW8 -> Core1 SW2, Core2 SW2 However I was intrigued to no...