Hi,
I hope you all are safe and healthy. Have you ever migrated from StackWise to Virtual StackWise Migration on Cisco 3850 switches? What is your recommendation or safe process to avoid the failure of migration? Currently, Both switches are in the StackWise and Will be migrate in Virtual StackWise soon. So do I need to set a factory default to the switches (both chassis) or only shutdown the uplink and downlink ports will prevent me (sure it will) from split-brain condition (only the time of removing StackWise cable and converting switches in the virtual StackWise and connecting cables)?
What are your suggestions or What challenges have you faced during this migration (if ever performed)?
07-13-2020 12:20 AM
- Perhaps not completely related to your platform , but you may want to read the paragrahs
StackWise Virtual mode and the one after that. Also check :
M.
07-13-2020 12:22 AM
Hello
I have personally never performed it the way you have quired however I would say save the running configuration of the stack and re-create from scratch as you need to reload both switches a couple of times anyway for the SVL and DAD links and then relocate the multiple interconnects for the MEC creations that is assuming the exiting stack running as a distribution node?
07-13-2020 12:51 AM
Hi,
Yes, this is at the distribution layer but it is not at the main distribution location. after that, there are many small switches for factory purposes so using a single MEC (between this switch to Core).