03-13-2024 06:52 PM
We are replacing the top 2 switches in multiple stacks. These stacks are 9300 48p. The top 2 switches will be replaced with 9300x-48HX. I was wondering if there was a way to preconfigure the stack to change to access ports from gig to TenGig, as our current method of deploying these switches into existing stacks is to stack them, boot them up, and then manually apply the config over console port by port. Is their a command to do this or a easier way?
03-13-2024 09:09 PM
Does page 21 in this document look like what you're trying to do?
03-14-2024 11:16 AM
You would need to do this in a maintenance window because once you add the 9300X to the stack, there will be a mismatch. So, you need to reload the whole stack to get both types of switches working together.
HTH