09-29-2011 06:26 AM - edited 03-07-2019 02:30 AM
Good day,
I will need to stack a second C3750G-48TS to my setup.
The instructions warn me to make sure that the power is switched off on the switch added to the stack.
Does this also apply for the switch that I am stacking to?
Or can I leave this one on?
Will I have down time when the new stack master is elected?
Thanks in advance.
Willem
Solved! Go to Solution.
09-29-2011 07:12 AM
Hi Willem,
Before you add the second switch, a good practice would be to increase the priority of the existing switch to a number greater than 1 (usually 15) to 'hardcode' the switch to be the master.
Also, to avoid any stack master election and downtime, you should power down the second switch before adding it to the stack
So basically,
1) Increase priority on existing switch ( switch 1 priority 15)
2) Power down second switch (new switch), connect stack cables and power it on. I am assuming you already have the right code on the new switch
HTH
Kapil
09-29-2011 06:48 AM
Hi,
Follow the instructions in this link to add a new switch to you stack
Does this also apply for the switch that I am stacking to?
Or can I leave this one on?
No, you can leave the current switch on
also, make sure you do this in an outage window
HTH
09-29-2011 06:57 AM
Hi Willem,
While adding a new switch to existing STACK, you need to power off the new switch not existing stack.
It should not be cause to down time.
Check the below link for clear information.
http://blog.zztopping.com/2009/11/24/adding-a-cisco-3750-switch-to-an-existing-stack/
Please rate the helpful posts.
Regards,
Naidu.
09-29-2011 07:12 AM
Hi Willem,
Before you add the second switch, a good practice would be to increase the priority of the existing switch to a number greater than 1 (usually 15) to 'hardcode' the switch to be the master.
Also, to avoid any stack master election and downtime, you should power down the second switch before adding it to the stack
So basically,
1) Increase priority on existing switch ( switch 1 priority 15)
2) Power down second switch (new switch), connect stack cables and power it on. I am assuming you already have the right code on the new switch
HTH
Kapil
09-29-2011 08:08 AM
Thank you for your support.
Very helpfull comments and advice!
It has been decided to the work in a maintenance window since the existing switches need IOS upgrades anyway.
Willem
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide