06-11-2018 12:09 AM - edited 03-19-2019 01:24 PM
Hi Experts,
Current CUCM: 9.1.2.11900-12 Unrestricted
Target CUCM: 11.5.1.14900-11 Unrestricted
I have upgraded our UC servers (currently in an isolated environment) from 9.1.2 to 11.5 and will be migrating the phones to 11.5.
Our CUCM 9.1.2 (which phones are currently registered at) Call Manager, Tomcat, IPSec, CAPF certificates (cluster security mode is set as 0) have already been expired, so on my 11.5 environment, all certificates have already been regenerated.
My question is: If I will swing the phones to 11.5, will I encounter any issues? Or it is safe to enable "Prepare Cluster for Rollback to pre 8.0" as when I checked the servers ITL, they are different since certificates have been regenerated.
Any help will be appreciated. Thanks!
Regards,
Florence
06-11-2018 05:59 AM
Hi there
If the upgrade was done using PCD, then you shouldn't have any issues. If not and you used a manual method, you can merge the ITL files using Bulk Certificate Migration method
Below is the guide and procedure.
Note
The Bulk Certificate Export method will only work if both clusters are online with network connectivity while the phones are being migrated. |
Another possible option if both the old and new clusters will be online at the same time is to use the Bulk Certificate migration method.
Remember that the IP Phones verify every downloaded file against either the ITL file, or against a TVS server that exists in the ITL file. If the phone needs to move to a new cluster, the ITL file the new cluster presents must be trusted by the old cluster's TVS certificate store.
The Bulk Certificate Export method works in the following way from the OS Adminstration > Security > Bulk Certificate page:
Hope this helps!
Cheers
Rath!
***Please rate helpful posts***
04-07-2019 02:51 PM
Hello Satheesh Kumar,
If I have used PCD for the migration I do not need to do Bulk Certificate Migration, I have used PDC, but the IP and the Hostname have changed in the new cluster.
I hope you can clarify this doubt, I have already read a lot of documentation but it is not clear to me.
06-11-2018 06:14 AM
04-08-2019 05:56 PM
09-02-2022 01:21 AM
Hi Nipun,
Could you please explain what are the risks if the Rollback feature is used on a per location basis?
We are migrating phones from CUCM to Avaya system.
Thanks,
Ana
09-02-2022 04:40 AM
Since your question is quite off topic to the OP it is advisable to create your own post with your question.