03-22-2016 08:17 AM - edited 03-01-2019 12:39 PM
Hello Folks,
There is my configuration :
1x UCS UCS-5108
4x UCS B200 M4 (1x VIC 1340)
2x UCS 2204XP (4x FET-10G)
2x 6248 (8 FEX-10G to chassis)
each 6248 will have 2 10Gb uplink to two cisco 6800 (in vss)
We will install windows 2012 bare Metal on the servers how can we implement
how can we do Fabric Failover with load sharing between all the path.
Kind regards,
03-23-2016 05:52 AM
Are you planning on doing "Fabric Failover with load sharing between all the path" from UCS? or that is something you want to do in the OS?
-Kenny
03-23-2016 05:58 AM
I am checking the best way to do load sharing to have the maximum bandwidth from the hosts to front end switch and vis-versa
03-23-2016 06:41 AM
Then in UCSM manager you would create a Service Profile with some vNICs going through FI-A and some others going through FI-B and you can either do failover through UCSM or the OS... some ppl just recommend to do failover at the OS level whenever you have an OS that supports and let UCSM do it only if the OS can't.
For vHBA failover, UCSM is not an option... it has to be done through the OS.
Hope that helps,
-Kenny
03-23-2016 10:52 AM
Best practise is to do Load balancing and failover (LBFO) in the OS, specially with W2012 ...where MSFT integrated this functionality in the OS.
http://download.microsoft.com/download/1/B/9/1B967767-D0E1-4AA3-9BA4-2FD2B98FBE27/Windows%20Server%202012%20R2%20NIC%20Teaming%20(LBFO)%20Deployment%20and%20Management.docx
03-23-2016 02:47 PM
last question :
what about connexion from 6200A and 6200B to the 2x6800 with vss
I need to have two separate portchannel ? (I have two uplinks ports from each 6200)
03-23-2016 03:10 PM
Yes !
http://www.cisco.com/c/en/us/support/docs/servers-unified-computing/ucs-manager/116095-configure-ucs-upstream-port-channel-00.html
http://www.cisco.com/c/en/us/support/docs/switches/nexus-5000-series-switches/116248-configure-fcoe-00.html
03-23-2016 03:23 PM
(based on the first link) it assumes that the connections from the 6200 must not be crossed to the front switchs ?
03-23-2016 03:31 PM
from 6200-A eg. one link to 6800-A resp 6800-B, resp
6200-B eg. one link to 6800-A resp 6800-B
And this 2 links are a portchannel (vpc,....)
see eg. http://www.netcraftsmen.com/why-vpc-ucs-to-nexus/
03-23-2016 04:06 PM
on our case we have two catalyst 6800 configured with vss (and there is no vPC support on the Catalyst 6800) do you have any advise ?
03-24-2016 05:33 AM
Catalyst dont support vPC but VSS is the same idea, so you can use the same design just probably not the same commands.
-Kenny
03-24-2016 08:10 AM
FYI:
https://support.microsoft.com/en-us/kb/3137691
-Kenny
03-24-2016 08:44 AM
this information come just in time ;)
here is my use case :
The B200M4 (W2K12) are Recorder Server of for a CCTV solution : they have to be attached to two network :
for teaming configuration I see two approach :
For 1 or 2, what teaming parameter is best suitable on the W2K12 hosts ?
Thank you,
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide