Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Hi Guys,So I was wondering if we could do this another way.We currently have 2 templates we use before and after adding in a fabric.Now if we have change something we ofcourse push this to the switches again to get them compliant again but we screw u...
Hi All,So I'm working on a learning and testing setup using CML with the goal of constructing network simulation to test network automation. The Idea is inspired by content from Daniel Dib.Initial objectiveMy objective is intentionally simple and foc...
Hi All,So when updating switches I noticed that a lot of my C3560CX-12PC-S switches are being split up in different platformsMost of them are in C3560C platform but that should be incorrect because the switch says there C3560CX-12PC-SSo i there a wa...
Hi Guys,So i couldn't find this in the knowledge article or anywhere else but currently we are changing up C9300-24P for a smaller version C9200-12P Due to getting a smaller closet for the switch. and 24 being too big for all the links.Instead of cho...
Hi All,Does anyone know if it's possible to automate Maintenance windows in Cisco DNA center with Servicenow.For example an upgrade for a switch is required and the customer shoots in a ticket with a time and date.Would it be possible to then have th...
We also had issues with this don't know exactly what the complete fix was but the main thing we had is that we needed to do switchport access VLAN x on the access ports otherwise it wouldn't work
I don't know if this works the same with the routers as with the switches. We have an onboarding template for or day2 configuration that basically just has this in the template:hostname {{ hostname }}And then under variables we just do required varia...
We had several issues with this going on,Also that only 2 fabric edges can be placed after each other and then an extended nodeAlso there was an error listed in the plug an play that apparently stopped the whole progress of other switches being disco...
We can see that it is getting connected to the pnp server in the logging but nothing else happens after that nothing show up in plug and play and also there is nothing in error.