best practice for failing over 6509 supervisor modules

netsquant
Level 1
Level 1

It was recommended by a cisco reseller to failover the supervisor modules every so often to ensure redundancy but i can't find the documentation that supports this nor anyone else doing it.

4 Replies 4

Reza Sharifi
Hall of Fame
Hall of Fame

Sup redundancy and fail over testing should be done during the testing phase of the equipment and/or after major IOS upgrade to make sure it actually works.  Once it has been determined that it works with no issue, there is no need to do it every so often.

HTH

Hi netsquant,
You dont failover them unless you are testing the same in a scheduled test case scenario.
You can check the status regularly using the gold feature general online diagnostics feature however as a best practise.

Rgds/dp

Pls rate helpful posts.
Sent from Cisco Technical Support Android App

Leo Laohoo
Hall of Fame
Hall of Fame

"hw-module module reset" is the command to reload a line card remotely.   This is just like pulling out the line card.  Very "rough" way of doing things.

If you want to test the redundancy, then the command "redundancy force-switchover" could be what you are looking for.

Catalyst 6000/6500 Series Switches with Redundant Supervisor Engines Software Image Upgrade Configuration Example

Thank you