Data Center Switches

cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Save 25% on Day-2 Operations Add-On License

 

Forum Posts

I understand that vxlan UDP src port of nexus9k is determined from L2/L3/L4 information of Original Packet. I added one flow of traffic with fixed L2/L3/L4 information and verified the UDP src port after vxlan encapsulation. But I confirmed that the ...

ksiino by Level 1
  • 500 Views
  • 1 replies
  • 0 Helpful votes

Hi, I have a below scenario for which I want to configure HSRP between two pairs of Stack Wise Virtual switches. Will this work? 1. There are four C9500 catalyst aggregation switches. Two in each DC. DC's are Layer 2 Stretched.2. One StackWise virtua...

So I had a couple of 9372 "sitting on a shelve" for a while , and thought I might donate them to a local technical school or a local LAN party for backbone ..... or something ... So I hooked them back up with power in order to remove all my old confi...

Regarding ECMP load balancing for Nexus 9000,The Catalyst 9000 series performs load balancing with fast switching on a per destination basis by default,I would like to know how Nexus 9000 performs balancing.

YEH by Level 1
  • 1481 Views
  • 2 replies
  • 0 Helpful votes

Hello,I'm trying to do a xconnect between two 10G ports on two different Nexus 9396PX switches, however, unable to do it in spite of following this document for guidelines: https://www.cisco.com/c/en/us/support/docs/switches/nexus-9000-series-switche...

ss1 by Level 1
  • 1843 Views
  • 6 replies
  • 0 Helpful votes