Switching

Discuss Catalyst brand switches with peers and experts.
cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Labels

Forum Posts

Hello, Cisco Community!I’m really happy to share that I’ll be hosting the Cisco Community Lab Series, a brand-new hands-on learning journey designed to help you build practical networking skills step by step.Every Thursday at 8 PM EST, I’ll post a ne...

Hello, We have a cisco 2821 ISR with IOS c2800nm-advsecurityk9-mz.124-3g.bin factory shipped image, but when we upgrade the IOS to c2800nm-advipservicesk9-mz.124-7c.bin i notice that there is a diference in the "show version" command:----------------...

juan_m_12 by Level 1
  • 4277 Views
  • 5 replies
  • 0 Helpful votes

Hi All,I am trying to find out which one of these switches will be better for access layer? The choices I have is a 4507 with Sup V or 6500 with sup32. I know that sup32 can handle multicast traffic better than a 4500 Sup V. I also feel IOS support i...

Hi all,i have a core switch, 6509, and an edge switch, 2960,which i need to connect using 2 uplinks. whenever i do this, my network experiences a loop, and behavior is very shaky.the 6509 is acting as STP root for all vlans, and the 2 ports connectin...

HiWe're planning to upgrade our network infrastructure to this design.R1 is connected to r2 and R3R4 is connected to R2 and R4 (wen applying this post the connection between R2 and R4 is not displayed correctly)R1 ---- R2 | | | |R3 ---- R4...

Hi there,i need help on how to upgrade the IOS image of my 3750 without having to lose any information. It's actually for a client, and i wish to schedule a reload time...the image would be lifted from a tftp server, but i just need to know the steps...

achalante by Level 1
  • 902 Views
  • 3 replies
  • 0 Helpful votes

I am a protocol tester.When a superior BPDU is sent to a switch port which is already in forwarding state, I want toknow whether the forwarding state will be broken and the port will issue a new proposal on its designated ports

Hi,we need to add a new switching module into a running catalyst 4506 currently has one free slot, and add six (6) WS-G5484 GBIC modules into this switching module.My question is can this be done while the switch is powered on? or it has to be done w...

tianlu008 by Level 1
  • 1928 Views
  • 13 replies
  • 0 Helpful votes

If the e0.1 and e0.2 interface of a router has an ip add of 192.168.1.1 and 192.168.2.1 respectively both having subnet masks of 255.255.255.0, and this e0 port is connected to a switch, what should vlan1(management vlan) ip add be? What subnet shoul...

I configured a router to perform NAT to allow outside traffic into an internal web server that only accepts connections on port 443. Here are my configs (ip addresses have obviously been changed): interface FastEthernet0/0ip address 10.32.15.102 255...