Data Center Switches

cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Save 25% on Day-2 Operations Add-On License

 

Forum Posts

Hallo,i have a project to migrate from Brocade switche to DS-C9148T-24PETK9  Switche.The Server and Storgae are connected redudant to Fabric A and Fabric B. We have 2 Data Center and in every Data Center i want to install 2 Switches.Switche 1 in Data...

We are looking to use Nexus 9336C-FX2 switches as ACI leaves, but are unsure whether there are limits on the use of breakout cables with this switch. Specifically, how many 10G ports can be presented on a single switch in ACI mode...I have found the ...

HelloI have a Nexus 5672UP switchWhen I turn it onAnd I connect the console cable to itIt does not show me anything and gives an MRC error and does not show anything else in the consoleAnd I can not get any connection to the switchAnd the status ligh...

Hey everyone, I am looking for a switch with 48 ports, for my data center.I want each port to have 10gigabit speed, and I don't mind 10GBASE-T copper or SFP+ cabling -  or should I?I'm not sure which models support this specification and which are re...

Hatfani by Level 1
  • 579 Views
  • 1 replies
  • 0 Helpful votes

Hi Everyone, Does DCNM Managed switches synchronized configuration entered manually on the switches ? if not is there a way to configure it to do this automatically ?why I ask is I have VXLAN fabric configured using DCNM and I entered some configurat...

Siprevz by Level 1
  • 589 Views
  • 0 replies
  • 0 Helpful votes